Solar plant: site data
Solar power plants: Cherkaskyi Raion, Cherkasy Oblast
PVGIS data cover 207 of 207 places: 1 kWp yields from 1,101 kWh a year (Hryhorivka) to 1,176 (Trushivtsi), median 1,147 kWh/kWp at an optimal tilt of about 37°. That equals the median of the oblast — 1,144 kWh/kWp.
- Median yield
- 1,147kWh/year
- From — to
- 1,101–1,176kWh/year
- Optimal tilt
- 37°median
- Places with PVGIS data
- 207of 207
Ground frame designer
A ground frame for a solar plant: Cherkaskyi Raion
The designer opens with latitude 49.4° and the DBN loads of the nearest regional centre — Черкаси: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Places
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.