Solar plant: site data
Solar power plant in Trakhtemyriv, Cherkaskyi Raion, Cherkasy Oblast
Trakhtemyriv: 1,129 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.3% below the oblast median (1,144). #201 of 207 in the rayon, #689 of 731 in the oblast.
Cherkasy, the rayon centre, is 79 km away. 124 m above sea level. 27 km away: Kaniv, the nearest bigger centre, 1,143 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Київ, 79 km. 12.07 m between rows, pitch 15.89 m (latitude 50.0°).
- Yield of 1 kWp
- 1,129kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,287kWh/year
- Row pitch
- 15.89m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,550 / 370Pa
Ground frame designer
A ground frame for a solar plant: Trakhtemyriv
The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Київ, 79 km: snow 1,550 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 145 kWh/kWp, December: 27 — 5.4 times less.
November: 36 against 39 in the oblast, 7.7% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,644 | 725 | 135 |
| 10 | 11,287 | 1,450 | 270 |
| 15 | 16,931 | 2,175 | 405 |
Example: a 10 kW ground frame
For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.
How these numbers are computed
Nearby
- Velykyi Bukryn4 km1,128 kWh/kWp
- Lukovytsia5 km1,114 kWh/kWp
- Malyi Bukryn7 km1,142 kWh/kWp
- Hryhorivka8 km1,101 kWh/kWp
- Romashky9 km1,140 kWh/kWp
- Khodoriv9 km1,142 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.