Hryhorivka: 1,101 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 3.8% below the oblast median (1,144). #207 of 207 in the rayon, #731 of 731 in the oblast.
Cherkasy, the rayon centre, is 71 km away. 142 m above sea level. 20 km away: Kaniv, the nearest bigger centre, 1,143 — 3.7% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 71 km. 12.01 m between rows, pitch 15.83 m (latitude 49.9°).
- Yield of 1 kWp
- 1,101kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,006kWh/year
- Row pitch
- 15.83m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Hryhorivka
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 71 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 143 kWh/kWp, December: 26 — 5.5 times less.
March: 86 against 94 in the oblast, 8.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,503 | 715 | 130 |
| 10 | 11,006 | 1,430 | 260 |
| 15 | 16,509 | 2,145 | 390 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Lukovytsia4 km1,114 kWh/kWp
- Malyi Bukryn6 km1,142 kWh/kWp
- Ivankiv6 km1,125 kWh/kWp
- Buchak7 km1,103 kWh/kWp
- Velykyi Bukryn7 km1,128 kWh/kWp
- Pshenychnyky7 km1,122 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)