Solar plant: site data
Solar power plants: Cherkasy Oblast
PVGIS data cover 731 of 731 places: 1 kWp yields from 1,101 kWh a year (Hryhorivka) to 1,186 (Novyi Kovrai), median 1,144 kWh/kWp at an optimal tilt of about 37°. That is 0.8% more than the median of Ukraine — 1,135 kWh/kWp.
- Median yield
- 1,144kWh/year
- From — to
- 1,101–1,186kWh/year
- Optimal tilt
- 37°median
- Places with PVGIS data
- 731of 731
Ground frame designer
A ground frame for a solar plant: Cherkasy Oblast
The designer opens with latitude 49.4° and the DBN loads of the nearest regional centre — Черкаси: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Rayons
| Rayon | Places | Median, kWh/kWp | From — to |
|---|---|---|---|
| Zvenyhorodskyi Raion | 197 | 1,142 | 1,128–1,153 |
| Zolotoniskyi Raion | 160 | 1,147 | 1,122–1,186 |
| Umanskyi Raion | 167 | 1,140 | 1,121–1,160 |
| Cherkaskyi Raion | 207 | 1,147 | 1,101–1,176 |
Towns and rayon centres
| Place | Rayon | kWh/kWp | Tilt |
|---|---|---|---|
| Cherkasy | Cherkaskyi Raion | 1,138 | 37° |
| Hlybochok | Zvenyhorodskyi Raion | 1,131 | 35° |
| Horodyshche | Cherkaskyi Raion | 1,145 | 37° |
| Kamyanka | Cherkaskyi Raion | 1,153 | 37° |
| Kaniv | Cherkaskyi Raion | 1,143 | 38° |
| Katerynopil | Zvenyhorodskyi Raion | 1,140 | 36° |
| Korsun-Shevchenkivskyi | Cherkaskyi Raion | 1,141 | 37° |
| Lysyanka | Zvenyhorodskyi Raion | 1,148 | 37° |
| Shpola | Zvenyhorodskyi Raion | 1,144 | 36° |
| Smila | Cherkaskyi Raion | 1,146 | 37° |
| Talne | Zvenyhorodskyi Raion | 1,142 | 36° |
| Uman | Umanskyi Raion | 1,160 | 36° |
| Zolotonosha | Zolotoniskyi Raion | 1,156 | 37° |
| Zvenyhorodka | Zvenyhorodskyi Raion | 1,145 | 36° |
Snow and wind
The nearest regional centre in the DBN — Черкаси: S₀ = 1,520 Pa, W₀ = 420 Pa (DBN V.1.2-2:2006). Each place’s page names its own nearest centre and the distance. Snow and wind: Черкаси
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.