Solar plant: site data
Solar power plant in Kamyanka, Cherkaskyi Raion, Cherkasy Oblast
Kamyanka: 1,153 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 0.8% above the oblast median (1,144). #56 of 207 in the rayon, #132 of 731 in the oblast.
Cherkasy, the rayon centre, is 45 km away. 127 m above sea level. 27 km away: Smila, the nearest bigger centre, 1,146 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 45 km. 11.25 m between rows, pitch 15.07 m (latitude 49.0°).
- Yield of 1 kWp
- 1,153kWh/year
- Tilt
- 37°3° east of south
- 10 kW
- 11,526kWh/year
- Row pitch
- 15.07m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Kamyanka
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 45 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 147 kWh/kWp, December: 29 — 5.1 times less.
January: 37 against 35 in the oblast, 5.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,763 | 735 | 145 |
| 10 | 11,526 | 1,470 | 290 |
| 15 | 17,289 | 2,205 | 435 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Rebedailivka4 km1,154 kWh/kWp
- Revivka5 km1,142 kWh/kWp
- Kosari6 km1,155 kWh/kWp
- Pliakivka7 km1,151 kWh/kWp
- Tymoshivka8 km1,154 kWh/kWp
- Hrushkivka9 km1,156 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.