Solar plant: site data

Solar power plant in Ivankiv, Cherkaskyi Raion, Cherkasy Oblast

Ivankiv: 1,125 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.7% below the oblast median (1,144). #203 of 207 in the rayon, #711 of 731 in the oblast.

Cherkasy, the rayon centre, is 67 km away. 137 m above sea level. 15 km away: Kaniv, the nearest bigger centre, 1,143 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 68 km. 11.97 m between rows, pitch 15.79 m (latitude 49.9°).

Yield of 1 kWp
1,125kWh/year
Tilt
37°2° east of south
10 kW
11,248kWh/year
Row pitch
15.79m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Ivankiv

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 68 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan56Feb89Mar117Apr138May141Jun145Jul142Aug114Sep82Oct37Nov27Dec

July: 145 kWh/kWp, December: 27 — 5.4 times less.

October: 82 against 87 in the oblast, 5.7% less.

Ivankiv: plants, kWh
kWpA yearJulyDecember
55,624725135
1011,2481,450270
1516,8722,175405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.