Solar plant: site data
Solar power plant in Chernyshi, Cherkaskyi Raion, Cherkasy Oblast
Chernyshi: 1,134 kWh per kWp a year, tilt 37° 4° east of south (PVGIS). 0.9% below the oblast median (1,144). #196 of 207 in the rayon, #621 of 731 in the oblast.
Cherkasy, the rayon centre, is 71 km away. 136 m above sea level. 16 km away: Kaniv, the nearest bigger centre, 1,143 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 71 km. 11.95 m between rows, pitch 15.77 m (latitude 49.9°).
- Yield of 1 kWp
- 1,134kWh/year
- Tilt
- 37°4° east of south
- 10 kW
- 11,336kWh/year
- Row pitch
- 15.77m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Chernyshi
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 71 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 146 kWh/kWp, December: 27 — 5.4 times less.
January: 38 against 35 in the oblast, 8.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,668 | 730 | 135 |
| 10 | 11,336 | 1,460 | 270 |
| 15 | 17,004 | 2,190 | 405 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Pyshchalnyky3 km1,147 kWh/kWp
- Troshchyn4 km1,134 kWh/kWp
- Pshenychnyky4 km1,122 kWh/kWp
- Dudari5 km1,147 kWh/kWp
- Lazirtsi5 km1,146 kWh/kWp
- Hlyncha5 km1,133 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.