Solar plant: site data
Solar power plant in Dubiyëvka, Cherkaskyi Raion, Cherkasy Oblast
Dubiyëvka: 1,150 kWh per kWp a year, tilt 37° facing south (PVGIS). Exactly the oblast median (1,144). #71 of 207 in the rayon, #185 of 731 in the oblast.
Cherkasy, the rayon centre, is 17 km away. 95 m above sea level. 13 km away: Smila, the nearest bigger centre, the same 1,146. Snow and wind from the nearest regional centre in the DBN — Черкаси, 17 km. 11.51 m between rows, pitch 15.33 m (latitude 49.4°).
- Yield of 1 kWp
- 1,150kWh/year
- Tilt
- 37°facing south
- 10 kW
- 11,497kWh/year
- Row pitch
- 15.33m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Dubiyëvka
The designer opens with this place’s coordinates, latitude 49.4° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 17 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 145 kWh/kWp, December: 30 — 4.8 times less.
January: 38 against 35 in the oblast, 8.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,749 | 725 | 150 |
| 10 | 11,497 | 1,450 | 300 |
| 15 | 17,246 | 2,175 | 450 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Bilozirya6 km1,147 kWh/kWp
- Ruska Poliana8 km1,147 kWh/kWp
- Stepanky9 km1,152 kWh/kWp
- Irdynivka10 km1,147 kWh/kWp
- Buzukiv12 km1,158 kWh/kWp
- Khutory12 km1,155 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.