Solar plant: site data
Solar power plant in Huta Mezhyritska, Cherkaskyi Raion, Cherkasy Oblast
Huta Mezhyritska: 1,138 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 0.6% below the oblast median (1,144). #189 of 207 in the rayon, #560 of 731 in the oblast.
Cherkasy, the rayon centre, is 42 km away. 91 m above sea level. 21 km away: Kaniv, the nearest bigger centre, the same 1,143. Snow and wind from the nearest regional centre in the DBN — Черкаси, 42 km. 11.69 m between rows, pitch 15.51 m (latitude 49.6°).
- Yield of 1 kWp
- 1,138kWh/year
- Tilt
- 37°3° east of south
- 10 kW
- 11,375kWh/year
- Row pitch
- 15.51m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Huta Mezhyritska
The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 42 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 29 — 4.9 times less.
January: 38 against 35 in the oblast, 8.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,688 | 710 | 145 |
| 10 | 11,375 | 1,420 | 290 |
| 15 | 17,063 | 2,130 | 435 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Kumeiky4 km1,147 kWh/kWp
- Sofiivka5 km1,143 kWh/kWp
- Luka5 km1,139 kWh/kWp
- Shelepukhi7 km1,145 kWh/kWp
- Sakhnivka8 km1,144 kWh/kWp
- Horobiivka8 km1,145 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.