Solar plant: site data
Solar power plant in Rozsoshyntsi, Cherkaskyi Raion, Cherkasy Oblast
Rozsoshyntsi: 1,172 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.5% above the oblast median (1,144). #9 of 207 in the rayon, #20 of 731 in the oblast.
Cherkasy, the rayon centre, is 51 km away. 104 m above sea level. 32 km away: Oleksandrivka, the nearest bigger centre, 1,152 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 51 km. 11.33 m between rows, pitch 15.15 m (latitude 49.1°).
- Yield of 1 kWp
- 1,172kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,722kWh/year
- Row pitch
- 15.15m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Rozsoshyntsi
The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 51 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 30 — 4.9 times less.
January: 40 against 35 in the oblast, 14.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,861 | 740 | 150 |
| 10 | 11,722 | 1,480 | 300 |
| 15 | 17,583 | 2,220 | 450 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Krasnosillia4 km1,173 kWh/kWp
- Subotiv6 km1,172 kWh/kWp
- Tinky6 km1,174 kWh/kWp
- Pohoriltsi7 km1,175 kWh/kWp
- Novoselytsia7 km1,175 kWh/kWp
- Chyhyryn9 km1,157 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.