Solar plant: site data

Solar power plant in Subotiv, Cherkaskyi Raion, Cherkasy Oblast

Subotiv: 1,172 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.4% above the oblast median (1,144). #13 of 207 in the rayon, #25 of 731 in the oblast.

Cherkasy, the rayon centre, is 53 km away. 83 m above sea level. 26 km away: Oleksandrivka, the nearest bigger centre, 1,152 — 1.7% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 52 km. 11.29 m between rows, pitch 15.11 m (latitude 49.1°).

Yield of 1 kWp
1,172kWh/year
Tilt
37°1° east of south
10 kW
11,715kWh/year
Row pitch
15.11m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Subotiv

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 52 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan57Feb97Mar121Apr141May144Jun148Jul146Aug118Sep88Oct41Nov30Dec

July: 148 kWh/kWp, December: 30 — 4.9 times less.

January: 40 against 35 in the oblast, 14.3% more.

Subotiv: plants, kWh
kWpA yearJulyDecember
55,858740150
1011,7151,480300
1517,5732,220450

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.