Solar power plant in Beresniahy, Cherkaskyi Raion, Cherkasy Oblast

Beresniahy: 1,143 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,144). #156 of 207 in the rayon, #419 of 731 in the oblast.

Cherkasy, the rayon centre, is 72 km away. 149 m above sea level. 19 km away: Kaniv, the nearest bigger centre, the same 1,143. Snow and wind from the nearest regional centre in the DBN — Черкаси, 73 km. 11.90 m between rows, pitch 15.72 m (latitude 49.8°).

Yield of 1 kWp
1,143kWh/year
Tilt
37°2° east of south
10 kW
11,425kWh/year
Row pitch
15.72m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Beresniahy

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 73 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan59Feb98Mar118Apr139May142Jun146Jul142Aug114Sep85Oct37Nov27Dec

July: 146 kWh/kWp, December: 27 — 5.4 times less.

February: 59 against 55 in the oblast, 7.3% more.

Beresniahy: plants, kWh
kWpA yearJulyDecember
55,713730135
1011,4251,460270
1517,1382,190405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.