Solar plant: site data

Solar power plant in Skarzhynka, Cherkaskyi Raion, Cherkasy Oblast

Skarzhynka: 1,167 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 2.0% above the oblast median (1,144). #27 of 207 in the rayon, #50 of 731 in the oblast.

Cherkasy, the rayon centre, is 48 km away. 223 m above sea level. 18 km away: Oleksandrivka, the nearest bigger centre, 1,152 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 48 km. 11.28 m between rows, pitch 15.10 m (latitude 49.1°).

Yield of 1 kWp
1,167kWh/year
Tilt
37°2° east of south
10 kW
11,669kWh/year
Row pitch
15.10m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Skarzhynka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 48 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan57Feb97Mar120Apr141May143Jun147Jul145Aug117Sep88Oct40Nov29Dec

July: 147 kWh/kWp, December: 29 — 5.1 times less.

January: 40 against 35 in the oblast, 14.3% more.

Skarzhynka: plants, kWh
kWpA yearJulyDecember
55,835735145
1011,6691,470290
1517,5042,205435

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.