Kutsivka: 1,150 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,144). #74 of 207 in the rayon, #189 of 731 in the oblast.

Cherkasy, the rayon centre, is 51 km away. 141 m above sea level. 20 km away: Shpola, the nearest bigger centre, the same 1,144. Snow and wind from the nearest regional centre in the DBN — Черкаси, 50 km. 11.01 m between rows, pitch 14.88 m (latitude 49.1°).

Yield of 1 kWp
1,150kWh/year
Tilt
36°2° east of south
10 kW
11,495kWh/year
Row pitch
14.88m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Kutsivka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 50 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan57Feb96Mar119Apr138May142Jun148Jul143Aug117Sep88Oct39Nov27Dec

July: 148 kWh/kWp, December: 27 — 5.5 times less.

February: 57 against 55 in the oblast, 3.6% more.

Kutsivka: plants, kWh
kWpA yearJulyDecember
55,748740135
1011,4951,480270
1517,2432,220405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.