Solar plant: site data
Solar power plant in Makiyivka, Cherkaskyi Raion, Cherkasy Oblast
Makiyivka: 1,150 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.5% above the oblast median (1,144). #70 of 207 in the rayon, #177 of 731 in the oblast.
Cherkasy, the rayon centre, is 57 km away. 167 m above sea level. 20 km away: Shpola, the nearest bigger centre, 1,144 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 56 km. 10.96 m between rows, pitch 14.83 m (latitude 49.0°).
- Yield of 1 kWp
- 1,150kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 11,502kWh/year
- Row pitch
- 14.83m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Makiyivka
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 56 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 147 kWh/kWp, December: 28 — 5.3 times less.
January: 37 against 35 in the oblast, 5.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,751 | 735 | 140 |
| 10 | 11,502 | 1,470 | 280 |
| 15 | 17,253 | 2,205 | 420 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Buda-Makiivka4 km1,149 kWh/kWp
- Kutsivka8 km1,150 kWh/kWp
- Zhuravka9 km1,148 kWh/kWp
- Tashlyk9 km1,151 kWh/kWp
- Pastyrske9 km1,146 kWh/kWp
- Matusiv9 km1,147 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.