Solar plant: site data

Solar power plant in Buriakove, Cherkaskyi Raion, Cherkasy Oblast

Buriakove: 1,171 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.3% above the oblast median (1,144). #14 of 207 in the rayon, #26 of 731 in the oblast.

Cherkasy, the rayon centre, is 67 km away. 138 m above sea level. 32 km away: Znamyanka, the nearest bigger centre, 1,163 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 64 km. 11.22 m between rows, pitch 15.04 m (latitude 49.0°).

Yield of 1 kWp
1,171kWh/year
Tilt
37°1° east of south
10 kW
11,707kWh/year
Row pitch
15.04m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Buriakove

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 64 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan56Feb97Mar121Apr141May144Jun149Jul147Aug119Sep88Oct41Nov29Dec

July: 149 kWh/kWp, December: 29 — 5.1 times less.

January: 38 against 35 in the oblast, 8.6% more.

Buriakove: plants, kWh
kWpA yearJulyDecember
55,854745145
1011,7071,490290
1517,5612,235435

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.