Solar plant: site data
Solar power plant in Kudasheve, Cherkaskyi Raion, Cherkasy Oblast
Kudasheve: 1,167 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 2.0% above the oblast median (1,144). #25 of 207 in the rayon, #47 of 731 in the oblast.
Cherkasy, the rayon centre, is 69 km away. 115 m above sea level. 27 km away: Znamyanka, the nearest bigger centre, the same 1,163. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 58 km. 11.19 m between rows, pitch 15.01 m (latitude 49.0°).
- Yield of 1 kWp
- 1,167kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,674kWh/year
- Row pitch
- 15.01m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Kudasheve
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 58 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 149 kWh/kWp, December: 29 — 5.1 times less.
January: 37 against 35 in the oblast, 5.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,837 | 745 | 145 |
| 10 | 11,674 | 1,490 | 290 |
| 15 | 17,511 | 2,235 | 435 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.
How these numbers are computed
Nearby
- Tarasovo-Hryhorivka4 km1,167 kWh/kWp
- Yukhymove5 km1,162 kWh/kWp
- Vershatsi5 km1,170 kWh/kWp
- Buriakove6 km1,171 kWh/kWp
- Hnenne7 km1,166 kWh/kWp
- Ruzhycheve7 km1,166 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.