Solar plant: site data

Solar power plant in Yukhymove, Kropyvnytskyi Raion, Kirovohrad Oblast

Yukhymove: 1,162 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). Exactly the oblast median (1,157). #107 of 254 in the rayon, #211 of 708 in the oblast.

Kropyvnytskyi, the rayon centre, is 54 km away. 132 m above sea level. 23 km away: Znamyanka, the nearest bigger centre, the same 1,163. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 54 km. 10.89 m between rows, pitch 14.76 m (latitude 48.9°).

Yield of 1 kWp
1,162kWh/year
Tilt
36°4° east of south
10 kW
11,623kWh/year
Row pitch
14.76m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Yukhymove

The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 54 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan57Feb97Mar119Apr139May143Jun149Jul146Aug119Sep88Oct39Nov28Dec

July: 149 kWh/kWp, December: 28 — 5.3 times less.

February: 57 against 52 in the oblast, 9.6% more.

Yukhymove: plants, kWh
kWpA yearJulyDecember
55,812745140
1011,6231,490280
1517,4352,235420

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kropyvnytskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.