Solar plant: site data
Solar power plant in Brovakhy, Cherkaskyi Raion, Cherkasy Oblast
Brovakhy: 1,140 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). Exactly the oblast median (1,144). #180 of 207 in the rayon, #514 of 731 in the oblast.
Cherkasy, the rayon centre, is 50 km away. 164 m above sea level. 14 km away: Korsun-Shevchenkivskyi, the nearest bigger centre, the same 1,141. Snow and wind from the nearest regional centre in the DBN — Черкаси, 50 km. 11.65 m between rows, pitch 15.47 m (latitude 49.5°).
- Yield of 1 kWp
- 1,140kWh/year
- Tilt
- 37°3° east of south
- 10 kW
- 11,395kWh/year
- Row pitch
- 15.47m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Brovakhy
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 50 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 145 kWh/kWp, December: 27 — 5.4 times less.
February: 58 against 55 in the oblast, 5.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,698 | 725 | 135 |
| 10 | 11,395 | 1,450 | 270 |
| 15 | 17,093 | 2,175 | 405 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Buda-Brovakhivska3 km1,138 kWh/kWp
- Kornylivka4 km1,143 kWh/kWp
- Sakhnivske5 km1,146 kWh/kWp
- Sakhnivka5 km1,144 kWh/kWp
- Kychyntsi6 km1,144 kWh/kWp
- Buda-Horobiivska7 km1,143 kWh/kWp
All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.