Solar power plant in Khudoliivka, Cherkaskyi Raion, Cherkasy Oblast

Khudoliivka: 1,173 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.5% above the oblast median (1,144). #7 of 207 in the rayon, #18 of 731 in the oblast.

Cherkasy, the rayon centre, is 31 km away. 98 m above sea level. 28 km away: Kamyanka, the nearest bigger centre, 1,153 — 1.7% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 31 km. 11.40 m between rows, pitch 15.22 m (latitude 49.2°).

Yield of 1 kWp
1,173kWh/year
Tilt
37°1° east of south
10 kW
11,726kWh/year
Row pitch
15.22m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Khudoliivka

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 31 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan58Feb98Mar122Apr141May144Jun148Jul146Aug119Sep89Oct40Nov30Dec

July: 148 kWh/kWp, December: 30 — 4.9 times less.

January: 38 against 35 in the oblast, 8.6% more.

Khudoliivka: plants, kWh
kWpA yearJulyDecember
55,863740150
1011,7261,480300
1517,5892,220450

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.