Solar power plant in Sahunivka, Cherkaskyi Raion, Cherkasy Oblast

Sahunivka: 1,168 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.1% above the oblast median (1,144). #24 of 207 in the rayon, #46 of 731 in the oblast.

Cherkasy, the rayon centre, is 29 km away. 101 m above sea level. 29 km away: Cherkasy, the nearest bigger centre, 1,138 — 2.7% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 28 km. 11.45 m between rows, pitch 15.27 m (latitude 49.3°).

Yield of 1 kWp
1,168kWh/year
Tilt
37°1° east of south
10 kW
11,678kWh/year
Row pitch
15.27m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sahunivka

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 28 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan58Feb97Mar122Apr141May145Jun149Jul147Aug119Sep87Oct39Nov28Dec

July: 149 kWh/kWp, December: 28 — 5.3 times less.

February: 58 against 55 in the oblast, 5.5% more.

Sahunivka: plants, kWh
kWpA yearJulyDecember
55,839745140
1011,6781,490280
1517,5172,235420

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.