Solar plant: site data

Solar power plant in Budyshche, Cherkaskyi Raion, Cherkasy Oblast

Budyshche: 1,140 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,144). #176 of 207 in the rayon, #496 of 731 in the oblast.

Cherkasy, the rayon centre, is 20 km away. 82 m above sea level. 20 km away: Cherkasy, the nearest bigger centre, the same 1,138. Snow and wind from the nearest regional centre in the DBN — Черкаси, 21 km. 11.66 m between rows, pitch 15.48 m (latitude 49.5°).

Yield of 1 kWp
1,140kWh/year
Tilt
37°2° east of south
10 kW
11,400kWh/year
Row pitch
15.48m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Budyshche

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 21 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan59Feb96Mar116Apr137May140Jun143Jul141Aug115Sep85Oct38Nov29Dec

July: 143 kWh/kWp, December: 29 — 4.9 times less.

January: 40 against 35 in the oblast, 14.3% more.

Budyshche: plants, kWh
kWpA yearJulyDecember
55,700715145
1011,4001,430290
1517,1002,145435

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.