Solar plant: site data

Solar power plant in Miroshnykivka, Cherkaskyi Raion, Cherkasy Oblast

Miroshnykivka: 1,131 kWh per kWp a year, tilt 37° 4° east of south (PVGIS). 1.1% below the oblast median (1,144). #200 of 207 in the rayon, #660 of 731 in the oblast.

Cherkasy, the rayon centre, is 59 km away. 136 m above sea level. 10 km away: Korsun-Shevchenkivskyi, the nearest bigger centre, 1,141 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 59 km. 11.64 m between rows, pitch 15.46 m (latitude 49.5°).

Yield of 1 kWp
1,131kWh/year
Tilt
37°4° east of south
10 kW
11,311kWh/year
Row pitch
15.46m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Miroshnykivka

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 59 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan57Feb97Mar116Apr138May142Jun145Jul142Aug115Sep84Oct36Nov25Dec

July: 145 kWh/kWp, December: 25 — 5.8 times less.

December: 25 against 28 in the oblast, 10.7% less.

Miroshnykivka: plants, kWh
kWpA yearJulyDecember
55,656725125
1011,3111,450250
1516,9672,175375

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.