Solar plant: site data

Solar power plant in Mykhailivka, Cherkaskyi Raion, Cherkasy Oblast

Mykhailivka: 1,143 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). Exactly the oblast median (1,144). #151 of 207 in the rayon, #411 of 731 in the oblast.

Cherkasy, the rayon centre, is 45 km away. 95 m above sea level. 12 km away: Kaniv, the nearest bigger centre, the same 1,143. Snow and wind from the nearest regional centre in the DBN — Черкаси, 45 km. 12.04 m between rows, pitch 15.81 m (latitude 49.6°).

Yield of 1 kWp
1,143kWh/year
Tilt
38°3° east of south
10 kW
11,427kWh/year
Row pitch
15.81m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Mykhailivka

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 45 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan60Feb97Mar117Apr137May139Jun143Jul142Aug115Sep84Oct38Nov30Dec

July: 143 kWh/kWp, December: 30 — 4.8 times less.

January: 40 against 35 in the oblast, 14.3% more.

Mykhailivka: plants, kWh
kWpA yearJulyDecember
55,714715150
1011,4271,430300
1517,1412,145450

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.