Solar plant: site data

Solar power plant in Mykhailivka, Cherkaskyi Raion, Cherkasy Oblast

Mykhailivka: 1,153 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 0.8% above the oblast median (1,144). #54 of 207 in the rayon, #125 of 731 in the oblast.

Cherkasy, the rayon centre, is 36 km away. 154 m above sea level. 9 km away: Kamyanka, the nearest bigger centre, the same 1,153. Snow and wind from the nearest regional centre in the DBN — Черкаси, 36 km. 11.31 m between rows, pitch 15.13 m (latitude 49.1°).

Yield of 1 kWp
1,153kWh/year
Tilt
37°3° east of south
10 kW
11,531kWh/year
Row pitch
15.13m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Mykhailivka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 36 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan56Feb96Mar119Apr139May143Jun147Jul143Aug117Sep88Oct40Nov27Dec

July: 147 kWh/kWp, December: 27 — 5.4 times less.

January: 37 against 35 in the oblast, 5.7% more.

Mykhailivka: plants, kWh
kWpA yearJulyDecember
55,766735135
1011,5311,470270
1517,2972,205405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.