Solar plant: site data

Solar power plant in Orlovets, Cherkaskyi Raion, Cherkasy Oblast

Orlovets: 1,149 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). Exactly the oblast median (1,144). #77 of 207 in the rayon, #192 of 731 in the oblast.

Cherkasy, the rayon centre, is 42 km away. 119 m above sea level. 12 km away: Horodyshche, the nearest bigger centre, the same 1,145. Snow and wind from the nearest regional centre in the DBN — Черкаси, 42 km. 11.41 m between rows, pitch 15.23 m (latitude 49.2°).

Yield of 1 kWp
1,149kWh/year
Tilt
37°3° east of south
10 kW
11,494kWh/year
Row pitch
15.23m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Orlovets

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 42 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan58Feb98Mar118Apr138May142Jun147Jul142Aug117Sep87Oct39Nov27Dec

July: 147 kWh/kWp, December: 27 — 5.4 times less.

February: 58 against 55 in the oblast, 5.5% more.

Orlovets: plants, kWh
kWpA yearJulyDecember
55,747735135
1011,4941,470270
1517,2412,205405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.