Solar plant: site data

Solar power plant in Bobrytsia, Cherkaskyi Raion, Cherkasy Oblast

Bobrytsia: 1,127 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.5% below the oblast median (1,144). #202 of 207 in the rayon, #702 of 731 in the oblast.

Cherkasy, the rayon centre, is 61 km away. 116 m above sea level. 7 km away: Kaniv, the nearest bigger centre, 1,143 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 61 km. 12.18 m between rows, pitch 15.95 m (latitude 49.8°).

Yield of 1 kWp
1,127kWh/year
Tilt
38°2° east of south
10 kW
11,266kWh/year
Row pitch
15.95m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Bobrytsia

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 61 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan58Feb97Mar116Apr137May139Jun143Jul140Aug112Sep83Oct37Nov28Dec

July: 143 kWh/kWp, December: 28 — 5.1 times less.

January: 38 against 35 in the oblast, 8.6% more.

Bobrytsia: plants, kWh
kWpA yearJulyDecember
55,633715140
1011,2661,430280
1516,8992,145420

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources