Holovkivka: 1,166 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.9% above the oblast median (1,144). #30 of 207 in the rayon, #54 of 731 in the oblast.

Cherkasy, the rayon centre, is 42 km away. 209 m above sea level. 19 km away: Oleksandrivka, the nearest bigger centre, 1,152 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 41 km. 11.31 m between rows, pitch 15.13 m (latitude 49.1°).

Yield of 1 kWp
1,166kWh/year
Tilt
37°2° east of south
10 kW
11,661kWh/year
Row pitch
15.13m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Holovkivka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 41 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan57Feb97Mar121Apr141May144Jun148Jul145Aug118Sep89Oct40Nov29Dec

July: 148 kWh/kWp, December: 29 — 5.1 times less.

January: 38 against 35 in the oblast, 8.6% more.

Holovkivka: plants, kWh
kWpA yearJulyDecember
55,831740145
1011,6611,480290
1517,4922,220435

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.