Solar plant: site data

Solar power plant in Serdiukivka, Cherkaskyi Raion, Cherkasy Oblast

Serdiukivka: 1,151 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.6% above the oblast median (1,144). #61 of 207 in the rayon, #160 of 731 in the oblast.

Cherkasy, the rayon centre, is 47 km away. 167 m above sea level. 19 km away: Kamyanka, the nearest bigger centre, the same 1,153. Snow and wind from the nearest regional centre in the DBN — Черкаси, 46 km. 10.99 m between rows, pitch 14.86 m (latitude 49.0°).

Yield of 1 kWp
1,151kWh/year
Tilt
36°2° east of south
10 kW
11,514kWh/year
Row pitch
14.86m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Serdiukivka

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 46 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan55Feb96Mar120Apr139May143Jun148Jul144Aug118Sep88Oct40Nov28Dec

July: 148 kWh/kWp, December: 28 — 5.3 times less.

January: 34 against 35 in the oblast, 2.9% less.

Serdiukivka: plants, kWh
kWpA yearJulyDecember
55,757740140
1011,5141,480280
1517,2712,220420

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.