Solar plant: site data

Solar power plant in Mykolaivka, Cherkaskyi Raion, Cherkasy Oblast

Mykolaivka: 1,150 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,144). #71 of 207 in the rayon, #185 of 731 in the oblast.

Cherkasy, the rayon centre, is 33 km away. 169 m above sea level. 7 km away: Smila, the nearest bigger centre, the same 1,146. Snow and wind from the nearest regional centre in the DBN — Черкаси, 33 km. 11.37 m between rows, pitch 15.19 m (latitude 49.2°).

Yield of 1 kWp
1,150kWh/year
Tilt
37°2° east of south
10 kW
11,497kWh/year
Row pitch
15.19m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Mykolaivka

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 33 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb97Mar119Apr139May141Jun147Jul142Aug117Sep87Oct39Nov28Dec

July: 147 kWh/kWp, December: 28 — 5.3 times less.

February: 57 against 55 in the oblast, 3.6% more.

Mykolaivka: plants, kWh
kWpA yearJulyDecember
55,749735140
1011,4971,470280
1517,2462,205420

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Cherkaskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.