Solar plant: site data
Solar power plants: Verkhovynskyi Raion, Ivano-Frankivsk Oblast
PVGIS data cover 41 of 41 places: 1 kWp yields from 939 kWh a year (Topilche) to 1,101 (Kokhan), median 1,061 kWh/kWp at an optimal tilt of about 38°. That is 3.3% less than the median of the oblast — 1,097 kWh/kWp.
- Median yield
- 1,061kWh/year
- From — to
- 939–1,101kWh/year
- Optimal tilt
- 38°median
- Places with PVGIS data
- 41of 41
Ground frame designer
A ground frame for a solar plant: Verkhovynskyi Raion
The designer opens with latitude 48.2° and the DBN loads of the nearest regional centre — Чернівці: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Places
| Place | kWh/kWp | Tilt |
|---|---|---|
| Berezhnytsia | 1,033 | 37° |
| Bila Richka | 1,017 | 38° |
| Biloberizka | 1,086 | 38° |
| Bukovets | 1,080 | 39° |
| Burkut | 949 | 34° |
| Bystrets | 979 | 37° |
| Cheremoshna | 1,059 | 38° |
| Cheretiv | 1,058 | 37° |
| Chorna Richka | 1,041 | 36° |
| Dovhopillia | 1,075 | 37° |
| Dzembronya | 1,067 | 40° |
| Holovy | 1,067 | 37° |
| Hramotne | 1,072 | 38° |
| Hryniava | 1,002 | 35° |
| Iltsi | 1,094 | 39° |
| Khorotseve | 1,075 | 37° |
| Kokhan | 1,101 | 39° |
| Krasnoillia | 1,056 | 37° |
| Krasnyk | 1,061 | 40° |
| Krivopol’ye | 1,062 | 38° |
| Kryvorivnia | 1,099 | 40° |
| Perekhresne | 985 | 32° |
| Perekhrestne | 1,072 | 38° |
| Polianky | 1,001 | 33° |
| Probiinivka | 1,088 | 40° |
| Rivnia | 1,057 | 37° |
| Senkivske | 1,076 | 39° |
| Skupova | 1,083 | 40° |
| Staische | 1,096 | 40° |
| Stebni | 1,100 | 39° |
| Stovpni | 1,039 | 39° |
| Topilche | 939 | 32° |
| Usteriky | 1,038 | 36° |
| Velykyi Khodak | 1,038 | 37° |
| Verkhovyna | 1,074 | 38° |
| Vipche | 1,048 | 39° |
| Volova | 1,039 | 38° |
| Vyhoda | 953 | 31° |
| Yavirnyk | 1,058 | 39° |
| Zamahora | 1,078 | 38° |
| Zelene | 1,073 | 39° |
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.