Solar plant: site data
Solar power plant in Bila Richka, Verkhovynskyi Raion, Ivano-Frankivsk Oblast
Bila Richka: 1,017 kWh per kWp a year, tilt 38° 16° west of south (PVGIS). 7.2% below the oblast median (1,097). #34 of 41 in the rayon, #664 of 700 in the oblast.
Verkhovyna, the rayon centre, is 21 km away. 1,026 m above sea level — above 500 m the DBN snow and wind are higher. 21 km away: Verkhovyna, the nearest bigger centre, 1,074 — 5.2% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 86 km. 10.67 m between rows, pitch 14.44 m (latitude 48.0°).
- Yield of 1 kWp
- 1,017kWh/year
- Tilt
- 38°16° west of south
- 10 kW
- 10,174kWh/year
- Row pitch
- 14.44m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Bila Richka
The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 86 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 116 kWh/kWp, December: 43 — 2.7 times less.
November: 57 against 48 in the oblast, 18.8% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,087 | 580 | 215 |
| 10 | 10,174 | 1,160 | 430 |
| 15 | 15,261 | 1,740 | 645 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Hryniava2 km1,002 kWh/kWp
- Hramotne2 km1,072 kWh/kWp
- Perekhrestne2 km1,072 kWh/kWp
- Plai4 km1,047 kWh/kWp
- Probiinivka5 km1,088 kWh/kWp
- Stovpni6 km1,039 kWh/kWp
All places: Verkhovynskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.