Solar plant: site data
Solar power plant in Bystrets, Verkhovynskyi Raion, Ivano-Frankivsk Oblast
Bystrets: 979 kWh per kWp a year, tilt 37° 21° east of south (PVGIS). 10.8% below the oblast median (1,097). #38 of 41 in the rayon, #686 of 700 in the oblast.
Verkhovyna, the rayon centre, is 12 km away. 807 m above sea level — above 500 m the DBN snow and wind are higher. 12 km away: Verkhovyna, the nearest bigger centre, 1,074 — 8.9% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 88 km. 10.54 m between rows, pitch 14.36 m (latitude 48.1°).
- Yield of 1 kWp
- 979kWh/year
- Tilt
- 37°21° east of south
- 10 kW
- 9,786kWh/year
- Row pitch
- 14.36m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Bystrets
The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 88 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 116 kWh/kWp, December: 34 — 3.4 times less.
October: 72 against 86 in the oblast, 16.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 4,893 | 580 | 170 |
| 10 | 9,786 | 1,160 | 340 |
| 15 | 14,679 | 1,740 | 510 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Dzembronya2 km1,067 kWh/kWp
- Krasnyk6 km1,061 kWh/kWp
- Velykyi Khodak7 km1,038 kWh/kWp
- Topilche7 km939 kWh/kWp
- Iltsi8 km1,094 kWh/kWp
- Krivopol’ye8 km1,062 kWh/kWp
All places: Verkhovynskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.