Solar plant: site data
Solar power plant in Iltsi, Verkhovynskyi Raion, Ivano-Frankivsk Oblast
Iltsi: 1,094 kWh per kWp a year, tilt 39° 8° east of south (PVGIS). Exactly the oblast median (1,097). #5 of 41 in the rayon, #394 of 700 in the oblast.
Verkhovyna, the rayon centre, is 5 km away. 642 m above sea level — above 500 m the DBN snow and wind are higher. 5 km away: Verkhovyna, the nearest bigger centre, 1,074 — 1.9% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 85 km. 11.04 m between rows, pitch 14.76 m (latitude 48.2°).
- Yield of 1 kWp
- 1,094kWh/year
- Tilt
- 39°8° east of south
- 10 kW
- 10,941kWh/year
- Row pitch
- 14.76m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Iltsi
The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 85 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 122 kWh/kWp, December: 47 — 2.6 times less.
November: 60 against 48 in the oblast, 25.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,471 | 610 | 235 |
| 10 | 10,941 | 1,220 | 470 |
| 15 | 16,412 | 1,830 | 705 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Krasnyk2 km1,061 kWh/kWp
- Vipche4 km1,048 kWh/kWp
- Staische4 km1,096 kWh/kWp
- Verkhovyna5 km1,074 kWh/kWp
- Velykyi Khodak7 km1,038 kWh/kWp
- Krivopol’ye7 km1,062 kWh/kWp
All places: Verkhovynskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.