Cheretiv: 1,058 kWh per kWp a year, tilt 37° 10° east of south (PVGIS). 3.5% below the oblast median (1,097). #23 of 41 in the rayon, #605 of 700 in the oblast.

Verkhovyna, the rayon centre, is 11 km away. 925 m above sea level — above 500 m the DBN snow and wind are higher. 11 km away: Verkhovyna, the nearest bigger centre, 1,074 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 73 km. 10.60 m between rows, pitch 14.42 m (latitude 48.2°).

Yield of 1 kWp
1,058kWh/year
Tilt
37°10° east of south
10 kW
10,582kWh/year
Row pitch
14.42m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Cheretiv

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 73 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan64Feb92Mar105Apr115May114Jun124Jul122Aug104Sep87Oct56Nov31Dec

July: 124 kWh/kWp, December: 31 — 4.0 times less.

December: 31 against 38 in the oblast, 18.4% less.

Cheretiv: plants, kWh
kWpA yearJulyDecember
55,291620155
1010,5821,240310
1515,8731,860465

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Verkhovynskyi RaionIvano-Frankivsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.