Solar plant: site data

Solar power plant in Berezhnytsia, Verkhovynskyi Raion, Ivano-Frankivsk Oblast

Berezhnytsia: 1,033 kWh per kWp a year, tilt 37° 5° east of south (PVGIS). 5.9% below the oblast median (1,097). #33 of 41 in the rayon, #647 of 700 in the oblast.

Verkhovyna, the rayon centre, is 6 km away. 892 m above sea level — above 500 m the DBN snow and wind are higher. 6 km away: Verkhovyna, the nearest bigger centre, 1,074 — 3.8% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 80 km. 10.60 m between rows, pitch 14.42 m (latitude 48.2°).

Yield of 1 kWp
1,033kWh/year
Tilt
37°5° east of south
10 kW
10,326kWh/year
Row pitch
14.42m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,410 / 500Pa

Ground frame designer

A ground frame for a solar plant: Berezhnytsia

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 80 km: snow 1,410 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

50Jan60Feb89Mar103Apr110May112Jun121Jul118Aug100Sep79Oct50Nov41Dec

July: 121 kWh/kWp, December: 41 — 3.0 times less.

May: 110 against 124 in the oblast, 11.3% less.

Berezhnytsia: plants, kWh
kWpA yearJulyDecember
55,163605205
1010,3261,210410
1515,4891,815615

Snow and wind: Івано-Франківськ

Example: a 10 kW ground frame

For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Verkhovynskyi RaionIvano-Frankivsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.