Solar power plant in Khorotseve, Verkhovynskyi Raion, Ivano-Frankivsk Oblast

Khorotseve: 1,075 kWh per kWp a year, tilt 37° 5° east of south (PVGIS). 2.0% below the oblast median (1,097). #12 of 41 in the rayon, #527 of 700 in the oblast.

Verkhovyna, the rayon centre, is 17 km away. 455 m above sea level. 16 km away: Vyzhnytsya, the nearest bigger centre, the same 1,076. Snow and wind from the nearest regional centre in the DBN — Чернівці, 68 km. 10.55 m between rows, pitch 14.37 m (latitude 48.1°).

Yield of 1 kWp
1,075kWh/year
Tilt
37°5° east of south
10 kW
10,749kWh/year
Row pitch
14.37m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Khorotseve

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 68 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan64Feb92Mar107Apr116May117Jun127Jul125Aug105Sep87Oct55Nov33Dec

July: 127 kWh/kWp, December: 33 — 3.8 times less.

November: 55 against 48 in the oblast, 14.6% more.

Khorotseve: plants, kWh
kWpA yearJulyDecember
55,375635165
1010,7491,270330
1516,1241,905495

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Verkhovynskyi RaionIvano-Frankivsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.