Solar plant: site data

Solar power plant in Petrashi, Vyzhnytskyi Raion, Chernivtsi Oblast

Petrashi: 1,049 kWh per kWp a year, tilt 37° 6° east of south (PVGIS). 8.2% below the oblast median (1,143). #82 of 94 in the rayon, #409 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 14 km away. 650 m above sea level — above 500 m the DBN snow and wind are higher. 14 km away: Vyzhnytsya, the nearest bigger centre, 1,076 — 2.5% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 65 km. 10.54 m between rows, pitch 14.36 m (latitude 48.1°).

Yield of 1 kWp
1,049kWh/year
Tilt
37°6° east of south
10 kW
10,491kWh/year
Row pitch
14.36m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Petrashi

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 65 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan63Feb94Mar104Apr112May112Jun122Jul120Aug103Sep85Oct54Nov33Dec

July: 122 kWh/kWp, December: 33 — 3.7 times less.

November: 54 against 47 in the oblast, 14.9% more.

Petrashi: plants, kWh
kWpA yearJulyDecember
55,246610165
1010,4911,220330
1515,7361,830495

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.