Solar plant: site data
Solar power plants: Kosivskyi Raion, Ivano-Frankivsk Oblast
PVGIS data cover 41 of 41 places: 1 kWp yields from 956 kWh a year (Sheshory) to 1,126 (Rozhniv), median 1,095 kWh/kWp at an optimal tilt of about 39°. That equals the median of the oblast — 1,097 kWh/kWp.
- Median yield
- 1,095kWh/year
- From — to
- 956–1,126kWh/year
- Optimal tilt
- 39°median
- Places with PVGIS data
- 41of 41
Ground frame designer
A ground frame for a solar plant: Kosivskyi Raion
The designer opens with latitude 48.3° and the DBN loads of the nearest regional centre — Чернівці: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Places
| Place | kWh/kWp | Tilt |
|---|---|---|
| Akreshory | 1,071 | 39° |
| Babyn | 1,083 | 38° |
| Bania-Bereziv | 1,096 | 39° |
| Brustury | 1,071 | 39° |
| Cherhanivka | 1,115 | 39° |
| Gorod | 1,024 | 35° |
| Khymchyn | 1,125 | 38° |
| Kobaky | 1,120 | 39° |
| Kosiv | 1,110 | 39° |
| Kosmach | 1,076 | 40° |
| Kuty | 1,120 | 39° |
| Liucha | 1,081 | 39° |
| Liuchky | 1,070 | 39° |
| Mykytyntsi | 1,118 | 38° |
| Nyzhnii Bereziv | 1,059 | 38° |
| Pistyn | 1,104 | 39° |
| Pochosa | 1,062 | 40° |
| Prokurava | 1,073 | 39° |
| Rechka | 1,046 | 37° |
| Rozhniv | 1,126 | 39° |
| Roztoky | 1,100 | 39° |
| Rybne | 1,123 | 39° |
| Serednii Bereziv | 1,088 | 39° |
| Shepit | 1,027 | 37° |
| Sheshory | 956 | 30° |
| Slobidka | 1,118 | 39° |
| Smodna | 1,123 | 39° |
| Snidavka | 1,060 | 38° |
| Sokolivka | 1,014 | 34° |
| Stari Kuty | 1,112 | 38° |
| Staryi Kosiv | 1,123 | 39° |
| Stopchativ | 1,110 | 39° |
| Tekuche | 1,081 | 40° |
| Tiudiv | 1,099 | 39° |
| Utoropy | 1,094 | 39° |
| Velykyi Rozhyn | 1,108 | 40° |
| Verbovets | 1,124 | 39° |
| Vyzhnii Bereziv | 1,095 | 39° |
| Yabluniv | 1,097 | 39° |
| Yavoriv | 1,037 | 38° |
| Zapokhar | 1,029 | 37° |
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.