Solar power plant in Gorod, Kosivskyi Raion, Ivano-Frankivsk Oblast

Gorod: 1,024 kWh per kWp a year, tilt 35° 2° west of south (PVGIS). 6.7% below the oblast median (1,097). #39 of 41 in the rayon, #658 of 700 in the oblast.

Kosiv, the rayon centre, is 4 km away. 409 m above sea level. 4 km away: Kosiv, the nearest bigger centre, 1,110 — 7.8% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 67 km. 10.17 m between rows, pitch 14.09 m (latitude 48.3°).

Yield of 1 kWp
1,024kWh/year
Tilt
35°2° west of south
10 kW
10,239kWh/year
Row pitch
14.09m · GCR 0.34
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Gorod

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 67 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan54Feb90Mar106Apr118May116Jun127Jul123Aug103Sep79Oct43Nov28Dec

July: 127 kWh/kWp, December: 28 — 4.5 times less.

December: 28 against 38 in the oblast, 26.3% less.

Gorod: plants, kWh
kWpA yearJulyDecember
55,120635140
1010,2391,270280
1515,3591,905420

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kosivskyi RaionIvano-Frankivsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.