Solar plant: site data

Solar power plant in Slobidka, Kosivskyi Raion, Ivano-Frankivsk Oblast

Slobidka: 1,118 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 1.9% above the oblast median (1,097). #10 of 41 in the rayon, #122 of 700 in the oblast.

Kosiv, the rayon centre, is 10 km away. 310 m above sea level. 6 km away: Vyzhnytsya, the nearest bigger centre, 1,076 — 3.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 53 km. 11.15 m between rows, pitch 14.87 m (latitude 48.3°).

Yield of 1 kWp
1,118kWh/year
Tilt
39°3° east of south
10 kW
11,181kWh/year
Row pitch
14.87m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Slobidka

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 53 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

55Jan67Feb95Mar109Apr119May117Jun129Jul126Aug107Sep90Oct58Nov47Dec

July: 129 kWh/kWp, December: 47 — 2.7 times less.

December: 47 against 38 in the oblast, 23.7% more.

Slobidka: plants, kWh
kWpA yearJulyDecember
55,591645235
1011,1811,290470
1516,7721,935705

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kosivskyi RaionIvano-Frankivsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.