Solar plant: site data
Solar power plant in Ispas, Vyzhnytskyi Raion, Chernivtsi Oblast
Ispas: 1,111 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 2.7% below the oblast median (1,143). #38 of 94 in the rayon, #362 of 422 in the oblast.
Vyzhnytsya, the rayon centre, is 9 km away. 325 m above sea level. 13 km away: Kosiv, the nearest bigger centre, the same 1,110. Snow and wind from the nearest regional centre in the DBN — Чернівці, 50 km. 10.92 m between rows, pitch 14.69 m (latitude 48.3°).
- Yield of 1 kWp
- 1,111kWh/year
- Tilt
- 38°1° west of south
- 10 kW
- 11,113kWh/year
- Row pitch
- 14.69m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Ispas
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 50 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 130 kWh/kWp, December: 43 — 3.0 times less.
November: 55 against 47 in the oblast, 17.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,557 | 650 | 215 |
| 10 | 11,113 | 1,300 | 430 |
| 15 | 16,670 | 1,950 | 645 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Miliyeve3 km1,123 kWh/kWp
- Slobidka4 km1,118 kWh/kWp
- Kybaky4 km1,126 kWh/kWp
- Chornohuzy4 km1,116 kWh/kWp
- Kobaky5 km1,120 kWh/kWp
- Maydan (Ispas)6 km1,120 kWh/kWp
All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.