Solar plant: site data
Solar power plant in Maydan (Ispas), Vyzhnytskyi Raion, Chernivtsi Oblast
Maydan (Ispas): 1,120 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.9% below the oblast median (1,143). #30 of 94 in the rayon, #345 of 422 in the oblast.
Vyzhnytsya, the rayon centre, is 10 km away. 463 m above sea level. 10 km away: Vyzhnytsya, the nearest bigger centre, 1,076 — 4.1% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 46 km. 11.13 m between rows, pitch 14.85 m (latitude 48.3°).
- Yield of 1 kWp
- 1,120kWh/year
- Tilt
- 39°2° east of south
- 10 kW
- 11,203kWh/year
- Row pitch
- 14.85m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Maydan (Ispas)
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 46 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 130 kWh/kWp, December: 45 — 2.9 times less.
December: 45 against 37 in the oblast, 21.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,602 | 650 | 225 |
| 10 | 11,203 | 1,300 | 450 |
| 15 | 16,805 | 1,950 | 675 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Seredniy Maydan4 km1,122 kWh/kWp
- Berezhnytsya5 km1,113 kWh/kWp
- Chereshenka6 km1,116 kWh/kWp
- Ispas6 km1,111 kWh/kWp
- Kybaky6 km1,126 kWh/kWp
- Chornohuzy7 km1,116 kWh/kWp
All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.