Solar plant: site data

Solar power plant in Chereshenka, Vyzhnytskyi Raion, Chernivtsi Oblast

Chereshenka: 1,116 kWh per kWp a year, tilt 40° 5° east of south (PVGIS). 2.4% below the oblast median (1,143). #35 of 94 in the rayon, #358 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 7 km away. 441 m above sea level. 7 km away: Vyzhnytsya, the nearest bigger centre, 1,076 — 3.7% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 50 km. 11.34 m between rows, pitch 15.00 m (latitude 48.2°).

Yield of 1 kWp
1,116kWh/year
Tilt
40°5° east of south
10 kW
11,156kWh/year
Row pitch
15.00m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Chereshenka

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 50 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

58Jan68Feb96Mar107Apr116May115Jun126Jul124Aug106Sep90Oct60Nov50Dec

July: 126 kWh/kWp, December: 50 — 2.5 times less.

December: 50 against 37 in the oblast, 35.1% more.

Chereshenka: plants, kWh
kWpA yearJulyDecember
55,578630250
1011,1561,260500
1516,7341,890750

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.