Solar plant: site data
Solar power plant in Rechka, Kosivskyi Raion, Ivano-Frankivsk Oblast
Rechka: 1,046 kWh per kWp a year, tilt 37° 17° east of south (PVGIS). 4.6% below the oblast median (1,097). #35 of 41 in the rayon, #630 of 700 in the oblast.
Kosiv, the rayon centre, is 13 km away. 550 m above sea level — above 500 m the DBN snow and wind are higher. 13 km away: Kosiv, the nearest bigger centre, 1,110 — 5.8% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 73 km. 10.66 m between rows, pitch 14.48 m (latitude 48.3°).
- Yield of 1 kWp
- 1,046kWh/year
- Tilt
- 37°17° east of south
- 10 kW
- 10,461kWh/year
- Row pitch
- 14.48m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Rechka
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 73 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 125 kWh/kWp, December: 34 — 3.7 times less.
December: 34 against 38 in the oblast, 10.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,231 | 625 | 170 |
| 10 | 10,461 | 1,250 | 340 |
| 15 | 15,691 | 1,875 | 510 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Brustury5 km1,071 kWh/kWp
- Yavoriv5 km1,037 kWh/kWp
- Sokolivka5 km1,014 kWh/kWp
- Sheshory6 km956 kWh/kWp
- Shepit6 km1,027 kWh/kWp
- Prokurava6 km1,073 kWh/kWp
All places: Kosivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.