Solar plant: site data
Solar power plant in Prokurava, Kosivskyi Raion, Ivano-Frankivsk Oblast
Prokurava: 1,073 kWh per kWp a year, tilt 39° 9° east of south (PVGIS). 2.2% below the oblast median (1,097). #28 of 41 in the rayon, #540 of 700 in the oblast.
Kosiv, the rayon centre, is 15 km away. 520 m above sea level — above 500 m the DBN snow and wind are higher. 15 km away: Kosiv, the nearest bigger centre, 1,110 — 3.3% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 67 km. 11.18 m between rows, pitch 14.90 m (latitude 48.3°).
- Yield of 1 kWp
- 1,073kWh/year
- Tilt
- 39°9° east of south
- 10 kW
- 10,732kWh/year
- Row pitch
- 14.90m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Prokurava
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 67 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 121 kWh/kWp, December: 46 — 2.6 times less.
November: 59 against 48 in the oblast, 22.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,366 | 605 | 230 |
| 10 | 10,732 | 1,210 | 460 |
| 15 | 16,098 | 1,815 | 690 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Brustury4 km1,071 kWh/kWp
- Sheshory6 km956 kWh/kWp
- Kosmach6 km1,076 kWh/kWp
- Akreshory6 km1,071 kWh/kWp
- Rechka6 km1,046 kWh/kWp
- Liucha8 km1,081 kWh/kWp
All places: Kosivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.