1 row of 10 panels, 6.10 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.
- Power
- 6.10kW
- Steel
- 246.2kg
- Posts
- 14
- Bolts
- 104
- Materials
- 35,292₴
- Yield
- 6,947kWh/year
Figures for the median zone (Cherkasy); all three zones are in the table below.
Ground frame designer
Open this frame in the builder
The builder opens with the REC Alpha Pro MG REC610AA Pro MG (HJT, bifacial) panel and the 1 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.
- No sign-up
- Snow and wind check
- Drawings and estimate
Three snow and wind zones
The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.
| Parameter | Low loadKherson · S₀ 760 · W₀ 480 | Median loadCherkasy · S₀ 1,520 · W₀ 420 | High loadChernihiv · S₀ 1,720 · W₀ 410 |
|---|---|---|---|
| Posts | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Rafters | Tube 60×60×2 | C-channel 60×40×2 | Tube 60×60×2 |
| Purlins and braces | C-channel 60×40×2 | C-channel 60×40×2 | C-channel 60×40×2 |
| Frames | 6 frames, pitch up to 2,520 mm | 7 frames, pitch up to 2,120 mm | 7 frames, pitch up to 2,120 mm |
| Posts | 12 | 14 | 14 |
| Footings (bored concrete) | 12 pcs, Ø300 mm, depth 900 mm | 14 pcs, Ø300 mm, depth 1,100 mm | 14 pcs, Ø300 mm, depth 1,300 mm |
| Concrete | 0.84 m³ | 1.20 m³ | 1.42 m³ |
| Tilt | 30° | 30° | 30° |
| Panel bottom / post top | 600 / 1,271 mm | 600 / 1,271 mm | 600 / 1,271 mm |
| Panel field size | 13,370 × 1,342 mm | 13,370 × 1,342 mm | 13,370 × 1,342 mm |
| Row spacing between tables (no shade on 21 December) | 4,880 mm at noon · 5,490 mm ±2 h | 5,410 mm at noon · 6,250 mm ±2 h | 5,930 mm at noon · 7,050 mm ±2 h |
| Steel | 228.2 kg | 246.2 kg | 266.2 kg |
| Bolts | M10 — 74, M8 — 22 | M10 — 82, M8 — 22 | M10 — 82, M8 — 22 |
| Panel clamps | end 4, middle 18 | end 4, middle 18 | end 4, middle 18 |
| Materials | 30,893 UAH | 35,292 UAH | 37,286 UAH |
| With installation and delivery | 47,573 UAH | 51,677 UAH | 53,961 UAH |
| Per 1 kW | 7,799 UAH/kW | 8,472 UAH/kW | 8,846 UAH/kW |
| Yield | 1,266 kWh/kW · 7,725 kWh/year | 1,139 kWh/kW · 6,947 kWh/year | 1,043 kWh/kW · 6,363 kWh/year |
| Strength σ/fy | 90% | 88% | 95% |
| Deflection / (L/200) | 89% | 74% | 79% |
| Rafter strength | 9% | 17% | 12% |
| Post utilisation | 6% | 7% | 8% |
| Utilisation | 85% | 51% | 42% |
| Depth vs frost depth | ok | ok | ok |
| Checks overall | with a caution | with a caution | with a caution |
Checks and cautions
Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.
- Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 520 mm, 6 frames. Purlin C-channel 60×40×2: strength 90%, deflection 89% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 120 mm, 7 frames. Purlin C-channel 60×40×2: strength 88%, deflection 74% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 120 mm, 7 frames. Purlin C-channel 60×40×2: strength 95%, deflection 79% of L/200 (snow on panel 1 106 Pa).
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 900: 0.064 m³ of concrete per post. Wind uplift on the front post ≈ 6.6 kN (with γ=1.5) vs ≈ 7.7 kN (concrete weight + soil friction, estimate) → 85%.
Bill of materials
The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 1,986 | 7 |
| П2 | Rear post | Tube 60×60×2 | 2,396 | 7 |
| Кр1 | Rafter (inclined beam) | C-channel 60×40×2 | 1,415 | 7 |
| Пк1 | Frame strut | C-channel 60×40×2 | 940 | 7 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,246 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 1,370 | 1 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 1,370 | 1 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 18 |
| — | Bolt M10×80 set · purlin to rafter | — | — | 14 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 7 |
| — | Bolt M10×120 set · post–rafter | — | — | 28 |
| — | Bolt M10×130 set · strut to rafter — through spacer inserts | — | — | 7 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 30 mm | — | — | 4 |
| — | Mid clamp (30–40 mm) | — | — | 18 |
| — | Bolt M8×50 + channel nut | — | — | 22 |
| — | Concrete for 14 posts, Ø300×1100 | — | — | 1.20 m³ |
Profile cutting
15 bars of 6,000 mm, 82.9 m of profile in total.
- Tube 60×60×26 bars
- C-channel 60×40×29 bars
Estimated cost
The engine's materials estimate for the median zone (Cherkasy).
- Materials
- 35,292₴
- With installation and delivery
- 51,677₴
- Per 1 kW
- 8,472UAH/kW
Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
All 23 lines of the engine's estimate, with prices
| Item | Quantity | Price, UAH | Sum, UAH |
|---|---|---|---|
| Tube 60×60×2, stock length 6 000 mm | 6 bar | 210 | 7,560 |
| C-channel 60×40×2, stock length 6 000 mm | 9 bar | 230 | 12,420 |
| C-channel connector (splice plate L 300) | 4 pcs | 90 | 360 |
| Bolt M10×25 cl. 8.8 set — purlins, braces, connectors | 18 pcs | 22 | 396 |
| Bolt M10×80 cl. 8.8 set — purlin to rafter | 14 pcs | 27 | 378 |
| Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts | 7 pcs | 27 | 189 |
| Bolt M10×120 cl. 8.8 set — post–rafter | 37 pcs | 27 | 999 |
| Bolt M10×130 cl. 8.8 set — strut to rafter — through spacer inserts | 7 pcs | 27 | 189 |
| Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts | 8 pcs | 27 | 216 |
| End clamp 30 mm | 4 pcs | 35 | 140 |
| Mid clamp (30–40 mm) | 18 pcs | 32 | 576 |
| Bolt M8×50 A2 + spring channel nut M8 | 25 pcs | 14 | 350 |
| Post base anchor pin (M10 / rebar Ø12) | 14 pcs | 20 | 280 |
| Borehole casing (roofing felt / PVC, 300 mm) | 14 pcs | 60 | 840 |
| Crushed stone 20–40 for the bottom of the boreholes | 0.10 m³ | 900 | 90 |
| Earth electrode: 2 rods Ø16×1.5 m + strip 40×4 | 1 set | 1,500 | 1,500 |
| Wire PV-3 6 mm² green-yellow | 33 m | 35 | 1,155 |
| Module earthing clip (under the clamp) | 10 pcs | 20 | 200 |
| Cable clip, stainless | 30 pcs | 5 | 150 |
| Zinc paint / cold galvanising spray 400 ml | 2 pcs | 350 | 700 |
| Concrete M200 for posts | 1.20 m³ | 3,800 | 4,560 |
| Rebar Ø10 (4 bars per post) | 73 m | 28 | 2,044 |
| Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 7 × 70 mm, 4 × 30 mm, 7 × 10 mm | 22 pcs | 0 | 0 |
| Materials | 35,292 | ||
Yield
Yield: 1,139 kWh per 1 kW a year, ≈ 6,947 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).