10 Ulica UL-620M-132DDGN (dual glass bifacial) panels (6.20 kW) on 1 table of 2 × 5. Snow and wind per the DBN for Chernihiv: S₀ 1,720 Pa, W₀ 410 Pa.

Power
6.20kW
Steel
253.6kg
Posts
8
Bolts
74
Materials
39,493₴
Yield
6,467kWh/year

Ground frame designer

Design the 6 kW plant in the builder

Opens the 2 × 5 table with the Ulica UL-620M-132DDGN (dual glass bifacial) panel and the loads for Chernihiv.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Panel

Ulica UL-620M-132DDGN (dual glass bifacial): 620 W, 2,382 × 1,134 mm, portrait.

The table's structure

Layout1 table, each 2 × 5 = 10 panels
Loads (DBN V.1.2-2:2006)snow S₀ 1,720 Pa, wind W₀ 410 Pa, frost depth 1.2 m
PostsTube 60×60×2
RaftersC-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2
Frames4 frames, pitch up to 1,780 mm
Posts8
Footings (bored concrete)8 pcs, Ø350 mm, depth 1,300 mm
Concrete1.10 m³
Tilt30°
Panel bottom / post top600 / 2,270 mm
Panel field size5,890 × 3,112 mm
Row spacing between tables (no shade on 21 December)13,040 mm at noon · 15,490 mm ±2 h
Steel253.6 kg
BoltsM10 — 50, M8 — 24
Panel clampsend 8, middle 16
Materials39,493 UAH
With installation and delivery56,223 UAH
Per 1 kW9,068 UAH/kW
Yield1,043 kWh/kW · 6,467 kWh/year

Checks and cautions

CheckValueStatus
Strength σ/fy76%passes
Deflection / (L/200)53%passes
Rafter strength42%passes
Post utilisation24%passes
Utilisation75%passes
Depth vs frost depthokpasses

No cautions.

Bill of materials

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,4574
П2Rear postTube 60×60×23,5954
Кр1Rafter (inclined beam)C-channel 100×50×2.53,9244
Пк1Frame strutC-channel 60×40×21,8044
Х1Longitudinal brace (cross)C-channel 60×40×22,4234
Р1Purlin (rail)C-channel 60×40×25,8904
—Bolt M10×25 set · purlins, braces, connectors——2
—Bolt M10×90 set · strut to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——16
—Bolt M10×130 set · post–rafter——16
—Bolt M10×140 set · strut to rafter — through spacer inserts——4
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×50 + channel nut——24
—Concrete for 8 posts, Ø350×1300——1.10 m³

Profile cutting

18 bars of 6,000 mm, 80.4 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 100×50×2.54 bars
  • C-channel 60×40×28 bars

Estimated cost

Materials
39,493₴
With installation and delivery
56,223₴
Per 1 kW
9,068UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,043 kWh per 1 kW a year, ≈ 6,467 kWh a year in total for Chernihiv (tilt 30°, the optimum for the latitude is 36.0°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other sizes in Chernihiv