Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 30 REC Alpha Pro MG REC610AA Pro MG (HJT, bifacial) panels (3×10)

3 rows of 10 panels, 18.30 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
18.30kW
Steel
801.5kg
Posts
18
Bolts
250
Materials
99,446₴
Yield
20,840kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pro MG REC610AA Pro MG (HJT, bifacial) panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2C-channel 41×41×2.5C-channel 60×40×2
Frames7 frames, pitch up to 2,120 mm9 frames, pitch up to 1,610 mm8 frames, pitch up to 1,830 mm
Posts141816
Footings (bored concrete)14 pcs, Ø450 mm, depth 1,500 mm18 pcs, Ø400 mm, depth 1,300 mm16 pcs, Ø350 mm, depth 1,500 mm
Concrete3.67 m³3.24 m³2.54 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,988 mm600 / 3,004 mm600 / 2,988 mm
Panel field size13,370 × 4,356 mm13,370 × 4,346 mm13,370 × 4,356 mm
Row spacing between tables (no shade on 21 December)14,730 mm at noon · 16,560 mm ±2 h16,320 mm at noon · 18,850 mm ±2 h17,890 mm at noon · 21,260 mm ±2 h
Steel688.4 kg801.5 kg750.2 kg
BoltsM10 — 156, M8 — 66M10 — 184, M8 — 66M10 — 170, M8 — 66
Panel clampsend 12, middle 54end 12, middle 54end 12, middle 54
Materials92,796 UAH99,446 UAH94,370 UAH
With installation and delivery139,573 UAH145,988 UAH141,060 UAH
Per 1 kW7,627 UAH/kW7,977 UAH/kW7,708 UAH/kW
Yield1,266 kWh/kW · 23,176 kWh/year1,139 kWh/kW · 20,840 kWh/year1,043 kWh/kW · 19,089 kWh/year
Strength σ/fy71%98%76%
Deflection / (L/200)59%78%54%
Rafter strength79%80%98%
Post utilisation40%41%49%
Utilisation99%88%100%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 20.9 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 99%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 13.9 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 88%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 15.4 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 100%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 610 mm, 9 frames. Purlin C-channel 41×41×2.5: strength 98%, deflection 78% of L/200 (snow on panel 977 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 367, cantilever 1 219 mm → strength 80%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 367, cantilever 1 219 mm → strength 98%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,6469
П2Rear postTube 60×60×24,3299
Кр1Rafter (inclined beam)C-channel 100×50×2.55,8059
Пк1Frame strutC-channel 41×41×2.52,4559
Пк2Front frame strutC-channel 41×41×2.53,2489
Х1Longitudinal brace (cross)C-channel 41×41×2.52,8614
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.51,3703
Р6Purlin (rail)C-channel 41×41×2.51,3703
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——57
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——9
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——54
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——45
—Bolt M10×140 set · strut to rafter — through spacer inserts——9
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——54
—Bolt M8×50 + channel nut——66
—Concrete for 18 posts, Ø400×1300——3.23 m³

Profile cutting

48 bars of 6,000 mm, 258.0 m of profile in total.

  • Tube 60×60×214 bars
  • C-channel 100×50×2.59 bars
  • C-channel 41×41×2.525 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
99,446₴
With installation and delivery
145,988₴
Per 1 kW
7,977UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 27 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm14 bar21017,640
C-channel 100×50×2.5, stock length 6 000 mm9 bar38020,520
C-channel 41×41×2.5, stock length 6 000 mm25 bar20030,000
C-channel connector (splice plate L 300)12 pcs901,080
Bolt M10×80 cl. 8.8 set — frame, struts9 pcs22198
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors48 pcs221,056
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts9 pcs27243
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter73 pcs271,971
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts45 pcs271,215
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts9 pcs27243
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)54 pcs321,728
Bolt M8×50 A2 + spring channel nut M873 pcs141,022
Post base anchor pin (M10 / rebar Ø12)18 pcs20360
Borehole casing (roofing felt / PVC, 300 mm)18 pcs601,080
Crushed stone 20–40 for the bottom of the boreholes0.23 m³900207
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow37 m351,295
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts3.23 m³3,80012,274
Rebar Ø10 (4 bars per post)108 m283,024
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 9 × 70 mm, 9 × 50 mm, 4 × 30 mm, 9 × 10 mm35 pcs00
Materials99,446

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 20,840 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.