Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 30 REC Alpha Pro MG REC610AA Pro MG (HJT, bifacial) panels (2×15)

2 rows of 15 panels, 18.30 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
18.30kW
Steel
620.9kg
Posts
20
Bolts
222
Materials
77,421₴
Yield
20,840kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pro MG REC610AA Pro MG (HJT, bifacial) panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames10 frames, pitch up to 2,150 mm10 frames, pitch up to 2,150 mm11 frames, pitch up to 1,940 mm
Posts202022
Footings (bored concrete)20 pcs, Ø400 mm, depth 1,100 mm20 pcs, Ø300 mm, depth 1,300 mm22 pcs, Ø300 mm, depth 1,300 mm
Concrete3.04 m³2.02 m³2.22 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,138 mm600 / 2,138 mm600 / 2,138 mm
Panel field size19,995 × 2,844 mm19,995 × 2,844 mm19,995 × 2,844 mm
Row spacing between tables (no shade on 21 December)9,810 mm at noon · 11,020 mm ±2 h10,870 mm at noon · 12,550 mm ±2 h11,910 mm at noon · 14,150 mm ±2 h
Steel570.4 kg620.9 kg657.6 kg
BoltsM10 — 158, M8 — 64M10 — 158, M8 — 64M10 — 168, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials78,458 UAH77,421 UAH81,532 UAH
With installation and delivery125,168 UAH124,581 UAH128,709 UAH
Per 1 kW6,840 UAH/kW6,808 UAH/kW7,033 UAH/kW
Yield1,266 kWh/kW · 23,176 kWh/year1,139 kWh/kW · 20,840 kWh/year1,043 kWh/kW · 19,089 kWh/year
Strength σ/fy69%94%82%
Deflection / (L/200)58%80%63%
Rafter strength85%76%73%
Post utilisation17%23%22%
Utilisation95%99%88%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 094, cantilever 758 mm → strength 85%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.7 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 95%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 11.1 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 99%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.8 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 88%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 150 mm, 10 frames. Purlin C-channel 60×40×2: strength 94%, deflection 80% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 940 mm, 11 frames. Purlin C-channel 60×40×2: strength 82%, deflection 63% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,41610
П2Rear postTube 60×60×23,46310
Кр1Rafter (inclined beam)Tube 60×60×23,61010
Пк1Frame strutC-channel 60×40×21,68810
Х1Longitudinal brace (cross)C-channel 60×40×22,6374
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×21,9952
Р8Purlin (rail)C-channel 60×40×21,9952
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——140
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——18
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×50 + channel nut——64
—Concrete for 20 posts, Ø300×1300——2.02 m³

Profile cutting

39 bars of 6,000 mm, 202.3 m of profile in total.

  • Tube 60×60×220 bars
  • C-channel 60×40×219 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
77,421₴
With installation and delivery
124,581₴
Per 1 kW
6,808UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm20 bar21025,200
C-channel 60×40×2, stock length 6 000 mm19 bar23026,220
C-channel connector (splice plate L 300)12 pcs901,080
Bolt M10×140 cl. 8.8 set — frame, struts50 pcs221,100
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors106 pcs222,332
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts18 pcs27486
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)56 pcs321,792
Bolt M8×50 A2 + spring channel nut M871 pcs14994
Post base anchor pin (M10 / rebar Ø12)20 pcs20400
Borehole casing (roofing felt / PVC, 300 mm)20 pcs601,200
Crushed stone 20–40 for the bottom of the boreholes0.14 m³900126
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow45 m351,575
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts2.02 m³3,8007,676
Rebar Ø10 (4 bars per post)120 m283,360
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 10 × 70 mm, 4 × 30 mm, 10 × 10 mm28 pcs00
Materials77,421

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 20,840 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×15 layout with other panels

Next